Green Acres Nursery & Supply

CASE STUDY

Roseville Retail Expansion

A 29,520-square-foot retail expansion delivered through Fabri-Steel West’s full-service design-assist, pre-engineered metal building supply, and installation expertise.

Project Overview

Green Acres Nursery & Supply expanded its Roseville, California retail campus with a 29,520-square-foot commercial retail facility designed to support continued growth while preserving the agricultural character that defines the brand.

Fabri-Steel West partnered with the architect, general contractor, and project team from the earliest stages of design to integrate a pre-engineered metal building (PEMB) system that balanced architectural aesthetics with structural efficiency. From concept design and planning through permitting, material supply, and installation, our team helped deliver a durable retail facility built for long-term performance.

Location

Roseville, CA

Building Size

29,520 SF

Project Type

Retail Expansion

General Contractor

DesCor Builders

Architect​

Borges

Fabri-Steel West Role​

Design Assist
PEMD Supply
Installation

THE CHALLENGE

Balancing Growth with Brand Identity

Green Acres Nursery & Supply needed to expand its Roseville retail campus with a 29,520-square-foot commercial retail facility while preserving the agricultural character customers know and expect. The project required a building system that could support long-term operational performance without compromising architectural design.

Working within an active retail environment also meant coordinating closely with the architect, general contractor, and project team to integrate a pre-engineered metal building (PEMB) system that met both structural and aesthetic requirements.

Key project considerations included:

  • Preserving Green Acres’ agricultural-inspired architectural identity
  • Integrating a pre-engineered metal building (PEMB) system into the design
  • Creating an open retail environment with a clear-span structural system
  • Delivering long-term durability and energy-efficient building performance
Steel framing being erected for the Green Acres Nursery & Supply retail expansion in Roseville, California by Fabri-Steel West.
Interior view of the structural steel framing inside the Green Acres Nursery & Supply expansion during construction.

DESIGN & ENGINEERING

Successful commercial retail projects begin with thoughtful coordination between the architect, general contractor, engineers, and specialty building partners. Early collaboration allowed the project team to integrate the pre-engineered metal building system into the architectural vision while maintaining construction efficiency and long-term performance.

One of the project’s defining structural features is the articulated raised center aisle, engineered to eliminate interior support columns and create an open retail environment. Combined with an insulated metal panel (IMP) roof system, the finished building delivers both architectural character and energy-efficient performance.

OUR SOLUTION

Design Assist

Worked alongside the architect and general contractor during planning and permitting.

PEMB Supply

Provided the complete pre-engineered building system.

Installation

Installed the building safely and on schedule,
allowing follow-on trades to begin ahead of plan.

PROJECT RESULTS

29,520 SF
Retail Expansion

18 Months
Project Duration

12 Weeks
Steel Installation

PROJECT HIGHLIGHTS

✔ Delivered Ahead of Schedule
✔ Full-Service Design Assist
✔ Raised Center Aisle Frame
✔ Energy-Efficient IMP Roof System

TESTIMONIALS

“John and his team were instrumental in the success of the Green Acres project. The retail building was big part of my critical path schedule. John and his team provided safe, qualified, and skilled erectors to get the building up and turned over for our client. They were collaborative in their efforts even before having boots on the ground to ensure our footing layout and bolt patterns were correct, as well as MEP coordination. Their timely install enabled us to start other trades ahead of schedule. When there were no details provided for the green house and lath house tranisitions, Fabri-Steel West came to the table with solutions which kept the job moving, and our client happy.”

— Keith Pratt
Senior Superintendent, DesCor Builders

“Working with Fabri Steel West on our project in Roseville was an exceptional experience from start to finish. As a building erector, their team demonstrated top-tier professionalism, impressive technical expertise, and a steadfast commitment to safety and quality.”

— Eric Snare
Director of Construction and Facillity Operations, Green Acres Supply

Stay Connected

Receive the latest Fabri-Steel West case studies, project updates, and commercial metal building insights delivered to your inbox.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name

Scroll to Top